DFS Bristol (December 2021)

This project saw an existing DFS retail unit stripped back to shell, with an internal partition installed to make two new units, DFS and Sofology.
Our works were as follows:
  • Construction of concrete service yard to the rear of the units
  • New kerbs around the site
  • Extension to car park in tarmac and ACO’s
  • Demolition of existing slab
  • Block paving to the front of the stores
  • Foul drainage to the units
  • Bollards around the shop frontages
  • New services for BT, Water & LV
  • Pad foundations and Footings
  • 220m2 of brick and block to various openings and construct new column
  • Concrete base for new totem sign
Team Valley Retail Park

Team Valley Retail Park

Remedial works to 140m2 of block paving installed by others on unsuitable sub base. Works entailed stacking all block paving for reuse, excavate and lay hardcore, tarmac base, lay blocks on sand cement bed and slurry grout joints.

Howdens Cromer Tarmac

Howdens cromer finnished yesterday 70mm 20mm base course then 40mm 10mm sma machine laid.

ROMO

ROMO HQ 2020 Update

After two and a half years and over £2.5 million of work carried out on this project it is finally coming to an end. We are currently finishing shaping up the landscape areas, installing footpaths and spreading topsoil over 12,500m2.

Malvern – Clinical Waste Incinerator

Engaged on this site since September 2019 we are currently carrying out a range of civils works including in-situ concrete, pile caps, forming openings through existing concrete, suspended slabs, mezzanine decks, walls, tables and pits. 5m deep tank for cess pit, oil interceptor tank, 26m x 8m attenuation tank, all new foul and storm drainage site wide, ducting and new services. 900m2 of various external concrete slabs. 500t crane mat and plate load testing. We are also carrying out the brick and blockwork package which entails a 11m high by 12m long extension to the building. As our works near completion in June we will move on to external works of groundworks kerbing, landscaping, footpaths, grass block and 1000m2 of tarmac.

ROMO Sutton Ashfield 3 Point Construction

ROMO HQ 2019 Update

ROMO HQ PROJECT

We have been engaged on this contract since October 2017 providing all aspects of groundworks.

Works carried out on this project include:

· 250 foundation pads and holding down bolts

· Ground beams

· CBR and Cube Testing

· 3500m3 of concrete works

· 2000m of 90mm and 32mm water supplies

· 6500m of ducting

· Internal and external concrete slabs

· 6000m3 of muck away

· Grouting of steel columns

· Storm and foul drainage

· 600m of Gatic/Aco channel drain

· 2600m of kerbing

· Lighting column bases

· 2000m3 of 6f2 laid

· 5000m3 of type one laid

· 175m long Gabion wall

· External paving

· 500m3 of bedrock excavation

· Shuttering works

· 300m of concrete upstands

· 120m of precast concrete cable troughs installed

· Substation bases for new incoming HV supplies including GRP housing supplied