DFS Bristol (December 2021)

Project Info

  • Category

    Block Paving, Drainage, Groundwork's, Tarmac

This project saw an existing DFS retail unit stripped back to shell, with an internal partition installed to make two new units, DFS and Sofology.
Our works were as follows:
  • Construction of concrete service yard to the rear of the units
  • New kerbs around the site
  • Extension to car park in tarmac and ACO’s
  • Demolition of existing slab
  • Block paving to the front of the stores
  • Foul drainage to the units
  • Bollards around the shop frontages
  • New services for BT, Water & LV
  • Pad foundations and Footings
  • 220m2 of brick and block to various openings and construct new column
  • Concrete base for new totem sign