Festival Retail Park – Hanley, Stoke-On-Trent

Project Info

  • Category

    Block Paving, Drainage, Groundwork's, Tarmac

The project comprised of demolishing a Toys’R’Us back to shell and dividing the unit into a new store for both Next and River Island. Works carried out during the project include but are not limited to:

Core drilling 100 holes into the floor slab for piling to enable a mezzanine floor to be installed, pile caps, double lift pit, single lift pit, double escalator pit, 360m2 concrete floor slab extension, cube testing, shuttering, steel fixing, bolt boxes, demolition, piling mats, ventform, methane vent system, ground beams, paving, new kerb lines, full construction tarmac, white lining, bollards, new storm drainage system, new foul system, street furniture.