Malvern – Clinical Waste Incinerator
Engaged on this site since September 2019 we are currently carrying out a range of civils works including in-situ concrete, pile caps, forming openings through existing concrete, suspended slabs, mezzanine decks, walls, tables and pits. 5m deep tank for cess pit, oil interceptor tank, 26m x 8m attenuation tank, all new foul and storm drainage site wide, ducting and new services. 900m2 of various external concrete slabs. 500t crane mat and plate load testing. We are also carrying out the brick and blockwork package which entails a 11m high by 12m long extension to the building. As our works near completion in June we will move on to external works of groundworks kerbing, landscaping, footpaths, grass block and 1000m2 of tarmac.