Racecourse Retail Park – Aintree

Project Info

  • Category

    Block Paving, Drainage, Groundwork's

This project involved redeveloping an existing retail unit to make way for a new Next store. Works carried out on this unit include but not limited to:

Break out 144 holes in the floor slab for piling, pile caps, lift pit full construction, escalator pit, de-watering, underpinning, floor slab extension, glazing foundations, steel fixing, shuttering, block paving, groundworks level changes, kerbs, asphalt, drainage connections, demolition works, joinery works, foul drainage, pop-ups, manholes, street furniture.