- Construction of concrete service yard to the rear of the units
- New kerbs around the site
- Extension to car park in tarmac and ACO’s
- Demolition of existing slab
- Block paving to the front of the stores
- Foul drainage to the units
- Bollards around the shop frontages
- New services for BT, Water & LV
- Pad foundations and Footings
- 220m2 of brick and block to various openings and construct new column
- Concrete base for new totem sign
Team Valley Retail Park
Remedial works to 140m2 of block paving installed by others on unsuitable sub base. Works entailed stacking all block paving for reuse, excavate and lay hardcore, tarmac base, lay blocks on sand cement bed and slurry grout joints.
ROMO HQ 2020 Update
After two and a half years and over £2.5 million of work carried out on this project it is finally coming to an end. We are currently finishing shaping up the landscape areas, installing footpaths and spreading topsoil over 12,500m2.
ROMO HQ 2019 Update
ROMO HQ PROJECT
We have been engaged on this contract since October 2017 providing all aspects of groundworks.
Works carried out on this project include:
· 250 foundation pads and holding down bolts
· Ground beams
· CBR and Cube Testing
· 3500m3 of concrete works
· 2000m of 90mm and 32mm water supplies
· 6500m of ducting
· Internal and external concrete slabs
· 6000m3 of muck away
· Grouting of steel columns
· Storm and foul drainage
· 600m of Gatic/Aco channel drain
· 2600m of kerbing
· Lighting column bases
· 2000m3 of 6f2 laid
· 5000m3 of type one laid
· 175m long Gabion wall
· External paving
· 500m3 of bedrock excavation
· Shuttering works
· 300m of concrete upstands
· 120m of precast concrete cable troughs installed
· Substation bases for new incoming HV supplies including GRP housing supplied
Racecourse Retail Park – Aintree
This project involved redeveloping an existing retail unit to make way for a new Next store. Works carried out on this unit include but not limited to:
Break out 144 holes in the floor slab for piling, pile caps, lift pit full construction, escalator pit, de-watering, underpinning, floor slab extension, glazing foundations, steel fixing, shuttering, block paving, groundworks level changes, kerbs, asphalt, drainage connections, demolition works, joinery works, foul drainage, pop-ups, manholes, street furniture.
Pierpoint Retail Park – Kings Lynn
This project consisted of the transformation of four existing retail units into new stores for Next, Tapi, DFS and B&M along with the resurfacing of the car park. Works carried out on this project include but not limited to:
Concrete floor slab extension, ACO slot drains, gulley pots, PCC chambers, metered water supplies, BT ducts, electric ducts, draw pits, new kerb lines, concrete ramps, retaining walls, ground level changes, brickwork, manholes, storm and foul pipes, pop-ups, footpaths, block paving, bollards, stop blocks, fencing, kee-klamp, sub-station bases, knee-rail fencing, trolley bays, class M handrails, metal work painting, car park resurfacing, white lining, palisade fencing, Armco barrier, street furniture, methane vent pipes, lift pit infill, blockwork repair, channels, full construction tarmac, cycle hoops, speed bumps, topsoil, concrete slabs, formwork, paving slabs, concrete foundations, hard-standings
Festival Retail Park – Hanley, Stoke-On-Trent
The project comprised of demolishing a Toys’R’Us back to shell and dividing the unit into a new store for both Next and River Island. Works carried out during the project include but are not limited to:
Core drilling 100 holes into the floor slab for piling to enable a mezzanine floor to be installed, pile caps, double lift pit, single lift pit, double escalator pit, 360m2 concrete floor slab extension, cube testing, shuttering, steel fixing, bolt boxes, demolition, piling mats, ventform, methane vent system, ground beams, paving, new kerb lines, full construction tarmac, white lining, bollards, new storm drainage system, new foul system, street furniture.