We are currently engaged on this contract to provide 250 foundation pads and bolt boxes for the new warehouse. This involves excavating down to bedrock some 4m in places, filling with concrete and inserting holding down bolts for the steel columns to sit on. We have currently laid around 2900 cubic meters of concrete. Works also undertaken include:

90mm mains and 32mm water supply install including manholes, control valves and check valve, 5500 tonnes of excavation and muck shift, grouting, temporary drainage, ground beams, shuttering, blockwork, substation concrete base, CBR testing, cube testing, concrete slabs, ducting to lower existing HV and street lighting cable, full construction entrance road, fencing, CCTV drainage survey.